Project
Sita waste sorting centre
The construction principle comprises three-dimensional curved steel framework trusses with a span of 50m on a concrete base.
- Locatie:
- Helmond
- Opdrachtgever:
- Sita - Helmond
- Architect:
- AIDarchitects - Westmalle (Belgiƫ)
- Aannemer:
- Heerkens van Bavel - Tilburg / Vanhout - Geel (Belgiƫ)