Project

C.T. Stork College

The new secondary school (11,400m²) and the gymnasium with 4 halls (2,160m²) are equipped with central heating based on a geothermal energy system.

Locatie:
Hengelo
Opdrachtgever:
The municipality Hengelo
Architect:
Gortemaker Algra Feenstra - Rotterdam / Morfis - Den Haag
Aannemer:
Aan de Stegge - Goor