Project
IKC de Brug
This Integrated Children’s Centre, which includes a gym, has a gross floor area of approximately 1,753 m² and is constructed using a timber frame.
- Locatie:
- Nieuwerbrug a/d Rijn
- Opdrachtgever:
- Municipality of Bodegraven-Reeuwijk
- Architect:
- De Zwarte Hond - Rotterdam
- Aannemer:
- Kwakkenbos - Harmelen